
Daewoo Nexia N150 ambient lighting test
30 minutes - 1 hour
[[ article.getBookmarkIcon() ]]
No tools

Daewoo Nexia N150 license plate lamp replacement
5 - 30 minutes
[[ article.getBookmarkIcon() ]]
Instrument


Removal and installation of the vacuum reservoir and the valve of the system for changing the length of the intake tract of the F16D3 Daewoo Nexia N150 engine
5 - 30 minutes
[[ article.getBookmarkIcon() ]]
Pit / Flyover

Removal and installation of the Daewoo Nexia N150 adsorber purge valve
5 - 30 minutes
[[ article.getBookmarkIcon() ]]
Instrument

Removing and installing the intake manifold of the A15SMS Daewoo Nexia N150 engine
1 to 3 hours
[[ article.getBookmarkIcon() ]]
Pit / Flyover

Removing and installing fuel tank Daewoo Nexia N150
30 minutes - 1 hour
[[ article.getBookmarkIcon() ]]
Pit / Flyover

Removal and installation of the intake manifold of the F16D3 Daewoo Nexia N150 engine
1 to 3 hours
[[ article.getBookmarkIcon() ]]
Pit / Flyover

Removal and installation of the fuel rail and injectors Daewoo Nexia N150
30 minutes - 1 hour
[[ article.getBookmarkIcon() ]]
Instrument

Removal and installation of the gauge of the gauge of temperature of a cooling liquid Daewoo Nexia N150
5 - 30 minutes
[[ article.getBookmarkIcon() ]]
Pit / Flyover

Removing and installing the throttle assembly Daewoo Nexia N150
30 minutes - 1 hour
[[ article.getBookmarkIcon() ]]
Instrument

Cleaning the throttle assembly Daewoo Nexia N150
30 minutes - 1 hour
[[ article.getBookmarkIcon() ]]
Instrument

Removing and installing the Daewoo Nexia N150 fuel gauge sensor assembly
5 - 30 minutes
[[ article.getBookmarkIcon() ]]
Pit / Flyover
Daewoo Nexia N150 throttle cable replacement
5 - 30 minutes
[[ article.getBookmarkIcon() ]]
No tools

Replacing the gasket for the cylinder head cover of the F16D3 Daewoo Nexia N150 engine
1 to 3 hours
[[ article.getBookmarkIcon() ]]
Instrument

Replacing the gasket for the cylinder head cover of the A15SMS Daewoo Nexia N150 engine
30 minutes - 1 hour
[[ article.getBookmarkIcon() ]]
Instrument

Removing and installing recirculation valve Daewoo Nexia N150
5 - 30 minutes
[[ article.getBookmarkIcon() ]]
Instrument

Removal and installation of the vehicle speed sensor and its drive on the Daewoo Nexia N150
5 - 30 minutes
[[ article.getBookmarkIcon() ]]
Instrument

Removal and installation of the knock sensor Daewoo Nexia N150
5 - 30 minutes
[[ article.getBookmarkIcon() ]]
Pit / Flyover

Removal and installation of the road roughness sensor of the engine management system A15SMS Daewoo Nexia N150
5 - 30 minutes
[[ article.getBookmarkIcon() ]]
Instrument
Filter by category
-
Maintenance
-
Undercarriage
-
Transmission
-
Steering
-
Brake system
-
Engine
-
Electrical equipment